Heat-Reflective Roof & Thermal Insulation Coatings: Beat the Heat
How heat-reflective and thermal insulation coatings cut roof temperatures, save energy, and protect waterproofing. A guide to cool-roof products and methods.
Read MoreCrackFix PU 35 is a high-strength, fast-cure polyurethane sealant designed for high-requirement bonding and sealing applications. It offers excellent wear and weather resistance and maintains performance across a wide range of temperatures.
| Appearance | White / Grey / Black paste |
|---|---|
| Density | 1.55 ± 0.05 g/cm³ |
| Tack Free Time | 25–35 minutes |
| Cure Speed | 3.0 mm/24h |
| Application Temperature | 5–35°C |
| Tensile Strength | ≈ 2.0 MPa |
| Elongation at Break | ≥ 300% |
| Hardness (Shore A) | 55 ± 5 |
| Working Temperature | -40°C to 80°C |
| Shelf Life (Aluminum Cartridge) | 12 months |
| Shelf Life (Sausage Packing) | 9 months |
| Storage Temperature | +5°C to +25°C |
CrackFix PU 35 is a high-strength, fast-cure polyurethane sealant designed for high-requirement bonding and sealing applications. It offers excellent wear and weather resistance and maintains performance across a wide range of temperatures from -40°C to 80°C.
Test conditions: Temperature 25±2°C, Humidity 50±5% RH
| Property | Test Standard | Value |
|---|---|---|
| Appearance | Vision | White / Grey / Black paste |
| Density | GB/T13477.2 | 1.55 ± 0.05 g/cm³ |
| Tack Free Time | GB/T13477.5 | 25–35 minutes |
| Cure Speed | — | 3.0 mm/24h |
| Application Temperature | — | 5–35°C |
| Property | Test Standard | Value |
|---|---|---|
| Tensile Strength | GB/T528-1998 | ≈ 2.0 MPa |
| Elongation at Break | GB/T528-1998 | ≥ 300% |
| Hardness (Shore A) | GB/T531-1999 | 55 ± 5 |
| Working Temperature | — | -40°C to 80°C |
Applied to bonding and sealing with high requirements on sealant elasticity and strength for industries like:
Surface preparation — Clean the surface of substrates, keep it dry, free of dust and grease.
Open and prepare — Open the cap and the cover of the bottom (for sausage: cut one end). Put on the nozzle and cut to the appropriate size according to the width of the joint.
Apply — Apply the glue to the clean surface, and assemble it within the tack free time.
Optimal conditions — Construction is preferably at a temperature of 20–30°C and humidity of 50–70% RH. If the temperature and humidity are too low, curing will be slow. If temperature and humidity are too high, bubbles may appear in the cured layer.
Important: During the application and curing process, the polyurethane adhesive should avoid contact with chemicals containing hydroxyl, amino, etc., which may affect the adhesive performance.
Expert insights, guides, and industry updates on injection grouting and structural repair
How heat-reflective and thermal insulation coatings cut roof temperatures, save energy, and protect waterproofing. A guide to cool-roof products and methods.
Read More
How curtain (veil) injection seals water from behind underground structures. A guide to waterproofing tunnels, basements, and cellars under ground pressure.
Read More
Sometimes you can't drill the substrate. Learn how surface adhesive packers and wedge packers let you inject and seal cracks with no drilling at all.
Read More